箱梁预制短线匹配施工关键技术
2020-12-08
来源:欧得旅游网
2011年第O2期 总第152期 福 建 建 筑 N002・2O11 Fujian Architecture Construction V01・152 箱梁预制短线匹配施工关键技术 程立平 (福建省交通建设质量安全监督局 350001) 摘要:本文以厦漳跨海大桥预应力混凝土箱梁施工为例就连续箱梁短线匹配预制工艺、关键工序及控制方法进行了介绍,与传 统的现浇方法相比,短线匹配法具有施工速度快、周期短、质量容易控制,成桥后混凝土收缩徐变小等优点,具有广泛的应用前景。 关键词:箱梁节段 短线匹配 几何线型控制 中图分类号:TU7 文献标识码:B 文章编号:1004--6135(2011)O2—0¨O72~04 The Key Technical of Short--line Match Casting forPrecast Concrete Box Girders Construction Cheng Liping (Fujian Provincial Communications In{rastructure Engineering Quality And Safety Supervision 350001) Abstract:This paper introduce the short—line match casting、key process and control method for precast concrete box girders in constreting a prestressed force concrete girder of Xiamen--Zhangzhou Channel bridge.Comparing with the traditionnal on—site mehtod,the short--line match casting has more advantages,such as faster speed of construction、shorter period、easy controled quality、smaller creep and shrinkage of concrete after construction,SO this technical will be applied widely. Keywords:Segments of Box Girders Short--line Match Casting Line--Style control of geometric l概述 厦漳跨海大桥北汊南引桥为(6×67.7m)×2联+(5×70m) 1 5900 一、、 一——~ 一 x4联单箱单室等高截面预应力混凝土箱梁,全长2212.4m, 左、右幅分离,单幅标准宽度16.5m,梁高3.8m,桥梁全宽 - 8 0 ; —=== , /i 'f/1 f 器 ,一 一 / - 33m,均采用短线匹配法节段预制、拼装工艺设计与施工,箱梁 横截示意图如图i。 I6700 毫 一 : 图l箱梁横截面示意图 图2预制厂平面布置图 北汉南引桥共划分节段1322榀,节段长度划分为3.1~ 台座;每条线各配置1台16t和1台180t龙门吊。整个预制场 平均月生产能力60 ̄70榀,预制工期:22个月,预制厂平面布 置图如图2。 4.Om,单个节段重量约106.1 ̄276.4t。用于节段生产的预制 工厂共设置两条生产线,其中1#生产线设4个预制台座和4 个钢筋绑扎台座;2#生产线设3个预制台座和3个钢筋绑扎 作者简介:程立平,男,1968年2月出生,高级工程师,长期从事公路工 程建设,研究方向:路桥。 收稿}1期:201l 01 O5 短线匹配法预制:就是将连续梁划分为多个短节段,考虑 荷载、预拱度、混凝土弹模、收缩徐变等因素后,将桥梁结构线 型空间坐标系转换成预制单元坐标系,以相邻的前一梁段作为 匹配梁段来控制待浇梁段的几何尺寸和线型,确保相邻梁段匹 配拼接精度。其原理示意见如图3: 与传统的现浇方法相比,短线匹配法具有施工速度快、周